Cafe and Play area

DSCF1923

The main work on the cafe is the old flower beds at the back has been removed and new foundation are being installed. It has involved moving a lot of soil from the raised flower beds so the foundation could be laid

DSCF1937

The play area work this week has been around getting in the safety surface and paths for the area so there doesnt seem to be a lot of work done but getting the safety base down is a big job

DSCF1939

In the same area the two trees at the entrance have been trimmed right back and I believe they will be removed so new gates can be installed